Skip to content

The Little Boltons

This project is a complete refurbishment, which includes lowering the basement floor by one meter and adding basements to both the front and rear of the property.
The scope encompasses a full MEP overhaul, featuring the installation of air conditioning and a discreet, plastered-in audio system throughout the property.
To enhance the ceiling height, we removed the roof and introduced cranked steel beams, while carefully reinstating the original slates. Additionally, three inline roof lights have been installed, filling the space with natural light that extends all the way down to the ground floor through the stairwell.
Interior finishes are highlighted by bespoke joinery and premium marble sourced directly from an Italian quarry, handpicked by the client. The entire project is set to be completed within a 72-week timeline, showcasing our commitment to exceptional craftsmanship and timely delivery.

Recent Projects